Zone Zero Deadlines for Hidden Hills
Zone Zero Hidden Hills / Deadlines
Zone 0 arrives in phases, not all at once
Read this top to bottom as best current estimates, anchored to the April 17, 2026 Board of Forestry draft. Bold items are locked by statute; the rest can move before final adoption.
-
Now, mid 2026
The April 17, 2026 draft is in its final comment and revision cycle. Nothing is enforceable yet. This is the planning window, and the cheapest time to schedule work.
-
Late 2026 (expected): final adoption
Immediate on adoption: no new combustible fences or gates within 5 feet of a structure, and full Zone Zero compliance for rebuilds and new construction. No grace period.
-
Est. 2027-2028: Phase 1
Clear combustible material from the 0-5 ft zone around existing structures: mulch, dead vegetation, firewood, hay, shavings, stored items.
-
Up to 5 years after adoption: Phase 2
Replace built combustibles in the zone: fences, gates, attached combustible structures. The Los Angeles County Fire Department sets this deadline for Hidden Hills.
The deadline table
| Requirement | Who it hits | When | Status |
|---|---|---|---|
| New combustible fences banned in the zone | Anyone building or replacing a fence near a structure | Immediately at adoption | Locked by statute |
| Rebuilds and new construction comply | New builds, fire rebuilds, major remodels | Immediately at adoption | Locked by statute |
| Phase 1: clear the 0-5 ft zone | Existing homes and structures in designated zones | Est. 2027-2028 | Estimate, per April 2026 draft |
| Phase 2: replace built combustibles | Existing fences, gates, attached structures in the zone | LA County sets it, up to 5 years after adoption | Local decision pending |
Deadline questions, answered
What is the very first deadline I could face?
The moment final regulations adopt, expected late 2026, two rules apply immediately: no new combustible fences within 5 feet of a structure, and full Zone Zero compliance for rebuilds and new construction. Everything else phases in afterward.
Who sets the Phase 2 deadline for Hidden Hills?
The Los Angeles County Fire Department, as the city's fire authority. State law allows the local jurisdiction up to 5 years after adoption for the built-item replacement phase.
Are these dates final?
No. Phase 1 at 2027-2028 is an estimate based on the April 17, 2026 Board of Forestry draft, and every date here can move before final adoption. That is exactly why this page separates what is immediate from what is estimated.
Beat the calendar, not just the deadline
Contractor schedules fill the moment dates become official. A free assessment now puts a plan, and a place in line, in your hands first.